Low-volume CNC machining

Low-volume CNC machining, from 1 to 10,000 parts.

No MOQ. The fixture and program from your prototype carry into the batch, so the 500th part matches the first — and you do not pay for setup twice.

Built for bridge orders
  • 1–10,000 parts, no MOQ
  • Prototype fixture carried into production
  • CMM first article before the run continues
  • 16-hour quotes
  • Repeat orders keep the program
Large aluminum base plate on the CMM
Large aluminum base plate on the CMM
Fit

When low volume is the right call

Before hard tooling

You need 50–500 parts to test a market, prove a design or bridge to injection moulding. Machining avoids tooling lead time and tooling risk.

High-mix, low-volume production

Ten part numbers, 20 pieces each, every quarter. We keep the programs and fixtures under your part numbers.

Service and spares

Replacement parts for equipment that is still in the field. One part is a valid order, and reverse engineering is available.

Custom and configured products

Knife parts, EDC hardware, fixtures and small mechanical assemblies where every order is slightly different.

Regulated but non-critical parts

Brackets, housings, trays and test fixtures that need traceability but not ISO 13485.

Pilot lines

Bridge tooling and nest fixtures for a line that is not ready for hard tooling.

What changes with quantity

The cost curve, honestly

QuantityWhat drives the priceWhat changes
1–5Programming, setup, fixture, first articleHighest per-part cost; the quote shows the setup separately
10–50Setup spread over more parts; same fixturePer-part cost drops sharply; finishing may have a batch minimum
100–500Cycle time dominates; inspection planPer-part cost stabilises; material buying improves
1,000–10,000Cycle time, material, finishing, inspectionWe quote a production route, not a prototype route

The numbers depend on the part. Send a drawing and we will show the actual curve for your geometry.

Setup continuity

Why the second order is cheaper

Most shops re-quote the setup every time. We keep the fixture, the program and the inspection plan under your part number. The second order starts at the machine, not at the drawing. That is also why the finish does not drift between the prototype and the batch: the same fixture holds the part, and the same program cuts it.

If you expect repeat orders, tell us at the quote stage. We will quote the first batch and the repeat batch separately, with the assumptions written down.

Process choice

Low volume vs injection moulding

Low-volume CNCInjection moulding
ToolingNoneSteel tool, typically weeks and thousands of dollars
Economic quantity1–10,000Usually 5,000+ to amortise tooling
Design changesChange the program; no tool reworkTool modification or a new tool
MaterialAny machinable gradePellet grade with moulding constraints
Lead time5–15 working daysTool build plus moulding

If you are not sure which route fits, send the drawing and the annual volume; we will tell you honestly if machining is the wrong process.

Questions buyers ask

FAQ

What is low-volume machining at GY?

Anything from one part to about 10,000 pieces a year. There is no minimum order, and no separate setup fee buried in the price.

Why is low volume more expensive per part?

Setup, programming, fixturing and inspection are spread over fewer parts. We show those costs in the quote so you can see what changes if you order 10 instead of 100.

Can you hold the prototype price for the production run?

The fixture and program carry over, so the second order usually costs less per part. We quote the production quantity separately instead of promising a price we cannot hold.

Do you keep the fixture for repeat orders?

Yes, for active programs. Tell us the expected repeat interval and we will store the fixture and program under your part number.

What is the smallest quantity you will anodise?

One part. Finishing is quoted as one finished part, one invoice; small batches may carry a minimum batch charge from the anodiser, which we show separately.

Can you ship partial batches?

Yes. Some customers take 10 pieces first, approve the fit, then release the remaining 200. We schedule the balance without re-quoting the setup.

Next step

Start with 1 part. Scale when the design is proven.

Send a STEP file and drawing. We reply with price, lead time and a DFM note within 16 hours.

Scroll to Top